
New TopShim run:

version = topshim 2.4.0
date = 2024-04-09
time = 19:02:19.533
command = topshim 

FINE SHIMMING

Parameters:

probe = Z166552_0019
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 13C
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Iteration 1: FWHM Before=22.0 Hz, Target= 0.2 Hz, After= 0.9 Hz
Iteration 2: FWHM Before= 0.9 Hz, Target= 1.3 Hz, After= 1.7 Hz
Iteration 3: FWHM Before= 1.7 Hz, Target= 0.2 Hz, After= 1.3 Hz
Iteration 4: FWHM Before= 1.3 Hz, Target= 0.2 Hz, After= 3.4 Hz
Iteration 5: FWHM Before= 3.4 Hz, Target= 0.8 Hz, After= 0.7 Hz
Iteration 6: FWHM Before= 0.7 Hz, Target= 0.6 Hz, After= 3.4 Hz
Iteration 7: FWHM Before= 3.4 Hz, Target= 0.3 Hz, After= 0.7 Hz
Iteration 8: FWHM Before= 0.7 Hz, Target= 0.5 Hz, After= 0.6 Hz
Iteration 9: FWHM Before= 0.6 Hz, Target= 0.9 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 1.03

shim changes: 
Z	-613
Z2	+90
Z3	-343
Z4	+1621
Z5	-1185

duration = 2 min 3 sec
completed successfully
finished Tue Apr  9 19:04:22 2024


========================================================================
